You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 25 Current »

Here are the sequential steps to run Cybershake NZ:

Step 1: Determine the list of faults considered

Step 2: Determine the number of simulation jobs for a given fault

Step 3: Create SRFs for all realisations of the considered faults

Step 4: Generate velocity models for the considered faults

Step 5: Run input verification and core-hour estimation

Step 6: Submit simulation jobs to HPC

 

Step 7 and onwards needs to be added once the codebase for the IM verification part of the workflow is stabilised. 


IM calc  and IMagg 

Verify IM based on epsilon

Plot IM, and empirical median

Calculate hazard

Plot for a list of sites

visualization tools

  • No labels