Overview
Duration: 18 May - 29 May
completed | in progress | on hold | review | to do |
---|---|---|---|---|
(vs record 61 completed sprint 19)
Epic | Story | Owner | Deliverables | Link |
---|---|---|---|---|
Validation | 1) 400m Whole NZ validation run (tectonic classification) 3) Assist Sarah with vs30 runs | 1) Robin 2) Jonney 3) James | 1) Underway 3) vs30 runs have started running successfully | |
Ground Motion DB | 4) Mw Reconciliation (comparison : John Ristau vs international dataset) | 1)Viktor 2) James 3) Mike / James 4) ? 5) ? | 1) 2) Some progress made. Still some issues though 3) | Hikurangi surface geometry |
Cybershake | 1) Cybershake Subduction (8 faults) : Complete BB after IM plot checks 2)Running 200m sims LF only - on Kisti / Maui (until Maui allocation leaves 100k)
| 1)Jason 2) Sung | 1) Subduction is complete 2) South and Central South island is completed. The remaining ~50 faults in the South Island have been installed and will run over first week of June. Then some quick validation of the south island before starting the NI. (on Maui) (500k on subscription and 500k on merit for remainder of CS 200 v20p6) 4) Checkpointing is being implemented. Have plans to reduce memory requirement but will need to investigate performance impact. 5) Waiting on DS / 200m SI for more plots. Subduction and Subduction + 400m maps were produced. | 2)PBS |
Slurm Workflow |
|
| 1) Deferred 2) Maui 400m CS data passed to Brendon 3) Deferred 4) Subduction gcmt source srfs able to be generated now | |
SeisTech |
4) Empirical DS - DB calculation |
| 1) a)simulation based core functionality in master, PR for seistech GMS logic | Roadmap (scientific functionality list) Production - TODO (longer term tasks) |
IM Calc | ||||
Bug fixes | ||||
Seismic risk | ||||
Machine Learning |
| Claudio | 1) 2) | GM classifier - progess |
Empirical engine | ||||
Vs30 | https://api.mapbox.com/styles/v1/-viktor-/ckartgw8p3x071jlpifdt7h31.html?fresh=true&title=view&access_token=pk.eyJ1IjoiLXZpa3Rvci0iLCJhIjoiY2pzam9lM2lnMTA5ZjQzcW9rejF3NjVjMCJ9.9OpmgK4HJtmuQ5h8JthBwg | |||
Misc |
|
| 2. Files classified to be kept or to be deleted 4) New allocations till end of August. 5) Tim and Cameron confirmed to work on Basin Modelling over semester break. Remote access for Move software available. | 2. HPC Data Management Policy |