IM Calculation Improvement

Submission integrated into automatic workflow

Large simulations chunked during loading and then processed. Memory usage is higher than expected but do not envision any cases where the memory usage exceeds limitations.

 

Management DB

Improved speed to return jobs needing to be submitted

Added queue, start and end time parameters to be stored in the DB.

Added retries count to automatically retry simulations

Daemon

Adjustable wall-clock parameter

18p9 run

Selected the runs to be done

Hossack 501r
PaeroaC 167r
Mangatete 334r
AlpineF2K 1r

 

Testing Plan

Day 1:

  • Generate list of faults

  • Autogenerate SRF and VM

Day 1 (night):

  • First run of 18p9

Day 2

  • Fix automation steps

Day 2 (night)

  • Second test run

Day 3

  • Repeat as necessary

Day n (waiting for storage issues to be fixed)

  • Port workflow to Maui

Day n + 2

  • Run 18p9 test on Maui

  • Fix automation as necessary

Day n + X

  • Resubmit 18p6 magnitude faults on Maui

 

 

Testing Results

Day 1
  • Remove dependancy from SRF_generation on post-processing (change to empirical engine)
  • Permission issue on VMs generated