completed | in progress | on hold | review | to do |
---|---|---|---|---|
77 |
(vs record 61 77 completed sprint 1950)
Epic | Story | Owner | Deliverables | Link |
---|---|---|---|---|
Validation | 1) 400m Whole NZ validation run (tectonic classification) 3) Assist Sarah with vs30 runs | 1) Robin 2) Jonney 3) James | 1) Underway 2) Started, not sure of the status. Vahid supplied new model 3) Done | |
Ground Motion DB | 4) Mw Reconciliation (comparison : John Ristau vs international dataset) | 1)Viktor 2) James 3) Mike / James 4) ? 5) ? | 1) On hold until more progress with NoisePy 2) |
Some progress made. Still some issues though 3)(Mike? Robbin thinks it's stable) | Hikurangi surface geometry | |||
Cybershake | 1) Cybershake Subduction (8 faults) : Complete BB after IM plot checks 2)Running 200m sims LF only - on Kisti / Maui (until Maui allocation leaves 100k)
| 1)Jason 2) Sung | 1) Subduction is complete 2) South and Central South island is completed. The remaining ~50 faults in the South Island have been installed and will run over first week of June. Then some quick validation of the south island before starting the NI. (on Maui) (500k on subscription and 500k on merit for remainder of CS 200 v20p6) 4) Checkpointing is being implemented. Have plans to reduce memory requirement but will need to investigate performance impact. 5) Waiting on DS / 200m SI for more plots. Subduction and Subduction + 400m maps were produced. (Check Kisti/Stampede2 can handle memory requirements) | 2)PBS |
Slurm Workflow |
|
| 1) Deferred 2) Maui 400m CS data passed to Brendon 3) Deferred 4) Done: Subduction gcmt source srfs can be generated now | |
SeisTech |
4) Empirical DS - DB calculation |
| 1) a) |
Empirical core functionality |
added | Roadmap (scientific functionality list) Production - TODO (longer term tasks) | |||
IM Calc | ||||
Bug fixes | ||||
Seismic risk | ||||
Machine Learning |
| Claudio | 1) Some additional visualization changes currently in progress |
Validation iteration, identified a couple of scenarios where GMC is not struggling | ||||
Empirical engine | ||||
Vs30 |
Misc |
|
|
2. Done :20Tb out of 120Tb deleted. Permission issues. 4) New allocations till end of August. 5) Tim and Cameron confirmed to work on Basin Modelling over semester break. Remote access for Move software available. |