You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

This is the modification of gmsim_v15.1.1 based on the work of Robin Lee in 2017/2018. Specifically,

-Removing the long period site amplification (or reducing to a 1-2s taper as opposed to the previous 2-5s taper?)

- Changing the HF path duration from Dp = 0.07R to the Boore and Thomson (2014) path duration developed using the NGA-West2 database.

 

---More details needed here.

  • No labels