Jason, Tom, Joel, Claudio

Aims

  • New Ensemble Format support
    • GMS
    • Integration
    • Deployment + Testing on both DEV & EA
    • Documentation
    • Feedback + bugs
  • ERF with uncertainty
    • Implement ERF sampling
    • Verification
    • Ensemble logic
  • Project API tests
  • API deployment + test scripts
  • UHS modifications
  • Rerun near fault factor for NZCode App
  • (Fix User vs30)
  • (IM type to object - multi sprint)
  • (Frontend tests)

Added during Sprint

  • Split IM selector into two different selectors
    • Intensity Measure
    • Vibration Period(If the chosen IM is pSA)
  • Get a new NZ Codes' Soil Class based on a user's modified Vs30
  • Tidy up Docker
    • Remove unnecessary Python package installation
  • Z1.0/Z2.5 inputs under Site Selection
  • Project creation with Z1.0/Z2.5 input fields
  • IM Correlation verification
  • GMS modifications (backend)
    • 16th/84th for selected GMs IM values
    • Project 16th/84th mean values
      • selected GMS
      • disagg
  • Project Data - Wellington, MoE
  • GMHazard bugs (lots)
  • CDF lookup bug
  • Download format modifications
  • GMS - Fixed incorrect vs30 bounds

Highlights

Latest version deployed to EA

Completed Issues

  • New Ensemble Format
  • ERF with uncertainty
    • ERF sampling
    • Verification
  • UHS modifications
  • Fix user vs30
  • Frontend User input hacks:
    • Split into IM and period selector
  • Update NZCode soil class based on user vs30
  • Docker tidy up
  • Project creation with Z1.0 & Z2.5
  • IM correlation verification
  • GMS modifications (backend)
    • 16th/84th for selected GMs IM values
    • Project 16th/84th mean values
      • selected GMs
  • Project data - Wellington, MoE
  • GMHazard bugs (lots)
  • CDF lookup bug
  • Download format modifications
  • GMS - fixed incorrect vs30 bounds

Outstanding

  • ERF with uncertainty
    • Ensemble logic
  • Project API tests
  • Near fault factor
  • (IM type to object)
  • (Frontend tests)
  • GMS - Project 16th/84th for mag/rrup (disagg)