Overview

Duration:  2 Dec - 13 Dec (8 days, Cass trip 5-6th Cancelled, 10 days)

completedin progresson holdreviewto do
453462

(vs record 61 completed sprint 19)


Epic
Story
Owner
Deliverables
Link
Validation
  1. Refactor Combine_ims.py to be python3 and integrate with current workflow (non-trivial)
  2. Save Z values to file
  3. Create a script to easily generate median and epsilon empiricals (save std → Sarah)

James

  1. Done
  2. Done
  3. Done, empirical IM permutations needs filtering though

Validation source perturbation (Source uncertainties) V2

Empirical aggregation

Cybershake

1) Wait on Karim for verification of results

Claudio/Jason


Cybershake Checklist

Slurm WorkflowCompare EMOD3D v304 & v308

James

Comparison started

Issues found have been investigated

EMOD3D v304 vs v308 comparison

VM domain boundary station 0 value problem

SeisTech

1) Full pSA imdb → uniform Hazard spectra (sim)

2) Setup seistech benchmark tests

3) Seistech frontend

4) Report prototype

5) Seistech plot changes + plot generation




Nice to have:"

  1. GMT map showing all the faults in the vicinity of the site (Viktor)
  2. Find why on-line version of GNS ERF slightly different (low priority)

Claudio, Jason, Daniel

1) Generated IMDB, need to create plots

2) Nothing done, need to fix eventually

3) See demo, todo:
- download of disagg data

4) Done

5) Done



Nice to have:

1) beachballs fixed, bug request for gmt regarding km region lat0

2) Done


IM Calc
  1. Orchestration/Integration of workflow
  2. Addition of new IMs (Wednesday talk) - create wikipage of laundry list and plan
  3. Porting MATLAB to Python (Jae's continuum work)

Jonney

Jason

James(verification/stress test)/Viktor



Converted and variables at each of the 4 main steps checked with 4 combinations of alpha,c,t1 params. Also verified by Jae who compared differences using Excel.

IM Calculation


Advanced IM integration

Bug fixes
  1. workflow bug
  2. cleaning of variable names (srf generation)
  3. Type2 : reproduciblility re. seed. Dump seed and reuse.
James
  1. LF2BB bug resolved - spelling issue
  2. Done
  3. Done (Seed generated at realisation step and saved to realisation file)

Seismic risk



Empirical engine





Misc
  1. e2e test on Stampede2 validation (100 times, avg(log()), plotting, maui/stampede histogram)
  2. Sim Atlas: Simplified update workflow (Direct update from CSV)
  3. AWS broken
  4. Fortran HF code (hopefully 1 week)
  5. Sbatch : push and enforce
  6. Dashboard daemon
  7. Docker container of Opensees
  8. SimAtlas simulation+animation
  9. NN-GMM Created/ran scripts for data collection

Sung

Jonney

  1. Done
  2. Completed.
  3. AWS Fixed
  4. Done
  5. On-hold
  6. Done
  7. Done
  8. 2nd batch completed

  • No labels