Epic | | Owner | Deliverables | |
---|
Validation | 1) Re-run advanced IMs 2)Generate gcmt faults to find correct orientation 3) Srf generation Subduction specific behaviour for GCMT (Robin to add more info)
| 1) Jonney 2) James | - still in progress
- Plots generated and passed on to Robin
|
|
Ground Motion DB | 1) Ground Motion Extraction 2) Hikurangi Geometry 3) Tectonic Classification 4) Mw Reconciliation (comparison : John Ristau vs international dataset) 5) Comparison with VH2017 | 1)Viktor 2) James 3) Mike / James 4) ? 5) ? | - ?
- On hold for this sprint
- Mike continuing
| Hikurangi surface geometry |
Cybershake | 1)Running 200m sims LF only - on Maui (until Maui comm allocation uses 500k) 2) Empirical DS - DB calculation 3) Empirical / Cybershake / ratio hazard maps | Jason | 1) 150k used on Comm00213 since start of June. Using ~10-15k a day at the moment. 500/~4500 realisations 2) Completed & plotted (with issues) need to investigate it. |
|
Slurm Workflow | - Generalize hacks for KISTI
- CH estimation based on linear regression
- Integrate with pre-processing (starting with VM)
- Separate db creation out of install
- Create generic slurm for the rest of install, make install operate on each fault
- Create a generic slurm for VM generation
- Pre-processing - GCMT to realisation – add some conditional logic about tectonic type (Brendon / Robin to consult about conditional parameters)
- Near-real time Simulation plan
- Cybershake Workflow Improvements
| - James
- Jason / Ethan
- Jonney
- James
- Jonney
- Jason / Jonney
| - Work mostly complete. Final tests on Kisti underway. Checks on tacc yet to begin.
- ?
- Deferred
-
- Done (from Jason side).
| 3. Adding Pre-processing into automated workflow |
Workflow Calc | 1) BA18 site amp | 1) Jason | 1) Started investigation. Read paper / code. Have done some quick scripting. Ready to do some testing. |
|
SeisTech | - GM Selection for Empirical
- Integrate basic (single branch) empirical GMS
- Automate documentation
- Front-end
| - Daniel / Claudio
- Background task (Jason)
- Andy
| 1) Done (no testing) | Roadmap (scientific functionality list) Production - TODO (longer term tasks) Frontend |
IM Calc |
|
|
|
|
Bug fixes |
|
|
|
|
Seismic risk |
|
|
|
|
Machine Learning | - NN - GMM
- Spatial plots
- Add hypo-depth to NN GMM dataset
- GM Classifier – see link
| Claudio | 1) Added (generalised) functionality for spatial map plotting. Currently supports IM residual maps, few others to be added. 2) Worked on validation & PhaseNet evaluation with Mike, 70-80% done in terms of integrating PhaseNet as p-wave picker (will allow multiple |
|
Empirical engine |
|
|
|
|
Vs30 |
| Viktor |
| demo video on slack http://hypocentre:5088 documented github page |
Misc | - SimAtlas simulation+animation:
- Batch 5 - keeping continual work
- Data management policy
- (classification of data importance)
- Plan to incorporate this as part of business as usual – what data do we need to keep and what can be regenerated as needed
- NoisePy
- Velocity Model basins
- Dashboard
- Add comm00213 as a separate allocation
- Changes of storage (TB): With Fortnightly update info added
- Zero point at the start of the allocation (graph doesn't start midway)
- Vs30 Server
| - Sung/Jonney
- Sung
- Viktor
- Jason
- Sung
- Viktor
| - Running
- Automated management code done.
- on hold
- -
- (a) done, (b-c) to be done
- Done
|
|