...
- Conduct manual verification of the existing IM plots from simulation
- Run empirical IM and ratio plots for the remaining faults
- Code IM ratio statistical analysis and plot histogram of the ratio for further investigation; then hand it over to software engineers to add to the workflow
- Conduct manual verification of the existing IM plots
- Run IM aggregate and hazard calc for SA(5.0) as an example case
- Verify the hazard curves as the code has changed again
- Run hazard calcs for CS18.6 for all IMs existing empirical PSHAs
- Compare hazard curves and hazard maps for 18.6 and 18.5
- Fill in the draft paper with updated results
- Review and revise – and send to Brendon for review
- Conduct hazard calculations via python code and compare with the openSHA results
...