  1. Conduct manual verification of the existing IM plots from simulation
  2. Run empirical IM and ratio plots for the remaining faults 
  3. Code IM ratio statistical analysis and plot histogram of the ratio for further investigation; then hand it over to software engineers to add to the workflow
  4. Conduct manual verification of the existing IM plots
  5. Run IM aggregate and hazard calc for SA(5.0) as an example case
  6. Verify the hazard curves as the code has changed again
  7. Run hazard calcs for CS18.6 for all IMs existing empirical PSHAs
  8. Compare hazard curves and hazard maps for 18.6 and 18.5
  9. Fill in the draft paper with updated results
  10. Review and revise – and send to Brendon for review
  11. Conduct hazard calculations via python code and compare with the openSHA results

...