...
Version | Num sources | SRF generation | VM domain | VM generation | Simulation specs | Estimated core-hours | Actual core hours | Notes |
---|---|---|---|---|---|---|---|---|
v17.8 | 15 (dominant in Canterbury) | vX.XX rupgenerator 3 hypo and 2 slip dist per source | automated based on PGV>5cm/s; 15kmRup, 5km land cutoff Default depth and duration scaling | 0.4km regular grid, Vs_min=500 | Transition freq = 0.25Hz | ~3k Fitzroy | First implementation; Focus on running workflow and comparison with empirically-derived hazard curves | |
v17.9 | ~161 (South Island) | hypo every 20 km along strike, 3 slip dist per source | Same as v17.8 | as for v17.8 | as for v17.8 | ~30k Fitzroy | Focus on extending number of sources and srf uncertianties | |
v17.10 | 540 (NZ-wide; just extend v17.9 to more sources) | Same as v17.9 | as for v17.9 | as for v17.9 | as for v17.9 | ~?? Fitzroy | ||
v17.11 (planning) | ~100 (Canterbury) | ?? Possibly more hypocentres down-dip | a. Improve depth scaling and duration scaling. Consider time step lengthening within stability limit | 0.2km regular grid, Vs_min=500 | Transition frequency = 0.5 Hz | ~500k Fitzroy(?) | Focus on producing NZ-wide output at lower freq transition | |
v ?? | ? |
...